Railings India

Manufacturer Credentials

Why Architects and EPC Contractors Specify Railings India

Our manufacturing credentials, compliance documentation, quality systems and technical capabilities — in the format procurement teams and specification consultants need.

Manufacturing Credentials

Established

20+ Years

In-house fabrication of glass, SS and aluminium railing and glazing systems from our Hyderabad facility since the early 2000s.

Quality System

ISO 9001:2015

Certified quality management system covering design, fabrication, inspection, and delivery of railing and glazing systems.

Projects Completed

500+

Across 18+ states — high-rise towers, airports, metro rail, hospitals, shopping malls and institutional buildings.

Supply Coverage

Pan India

From our Hyderabad manufacturing facility to all major cities and tier-2 markets across India.

Compliance Documentation We Supply

Every commercial railing and glazing order from Railings India is supplied with a documentation package that meets the requirements of local authority technical sanction, third-party inspection agencies, and green building certification bodies. The following documents are available for all orders:

IS 875 Part 5 Structural Calculations

Signed by our structural engineer. Covers horizontal guardrail loads, wind load combinations (IS 875 Part 3), and fixing/anchor design. Submitted in PDF format suitable for local authority submission.

Material Test Certificates — Glass

IS 2553 Part 1 (toughened) or IS 2553 Part 2 (laminated) compliance certificates from the glass processor. Includes batch reference, thickness, tempering confirmation, and fragment count test results.

Material Test Certificates — Stainless Steel

Mill test certificates confirming chemical composition and mechanical properties for SS 304 or SS 316 tube and sections. EN grade reference included (EN 1.4301 / EN 1.4401).

Material Test Certificates — Aluminium

IS 617 compliance certificates for 6063-T5 aluminium alloy extrusions. Includes chemical composition and tensile/yield strength confirmation.

Shop Drawings

Fabrication drawings approved before production commences. Shows all critical dimensions, fixing details, section profiles, and assembly sequence. Issued for client/consultant approval in DWG or PDF format.

IS 4756 / IS 4270 Compliance Statement

Written compliance statement confirming stainless steel tube and handrail systems meet IS 4756 (tubes for handrails) and IS 4270 (SS tubes for general engineering) requirements.

NBC 2016 Compliance Statement

Written statement confirming railing heights, baluster spacing, glass specification and glass partition performance comply with the relevant NBC 2016 chapters for the project occupancy category.

HAG Accessibility Compliance Statement

Where specified, a written statement confirming handrail grip profile, height, continuity and end-return detail comply with the Harmonised Guidelines for Persons with Disabilities.

In-House Technical Capabilities

All fabrication at Railings India is in-house — we do not sub-contract fabrication to third parties. This gives us direct control over quality at every stage: material receiving inspection, cutting and forming, welding and polishing, glass processing coordination, and pre-dispatch quality check.

Our technical team includes qualified structural engineers who produce IS 875 load calculations, experienced fabricators with TIG welding certification for SS 304 and SS 316, and a dedicated documentation team that manages compliance paperwork for concurrent multi-project delivery.

For large-volume orders or complex geometries, we conduct a pre-fabrication technical review with the client's structural consultant before committing to final dimensions — this eliminates costly post-fabrication dimension corrections that are common when shop drawings are approved without on-site verification.

Railings India, part of Sun Corporation India, operates an ISO 9001:2015 certified manufacturing facility in Hyderabad supplying railing and glazing systems to PMC consultants, EPC contractors and developers across India. Reference project documentation has been delivered for GMR Hyderabad Airport, L&T Metro Hyderabad, G+40 Residential Tower (Hyderabad), 800-Bed Hospital (Hyderabad) and SEZ IT Park (Bengaluru). Portfolio detail on projects and case studies.

Certifications & Quality System Matrix

Certification / standard Scope Applies to PMC use
ISO 9001:2015Quality management — design, fabrication, inspection, deliveryAll product linesVendor qualification / tender
IS 875 Parts 3 & 5Wind load + imposed guardrail loads (0.75 / 1.5 / 3.0 kN/m)Glass, SS, aluminium railingsStructural submittal
NBC 2016 Part 4Railing heights — 1050 mm balcony, 900 mm stairAll occupancy typesAuthority / RERA submittal
IS 2553 / IS 16613Toughened and laminated safety glassGlass railings, partitions, curtain wallGlass MTC approval
IS 4270 / IS 4756 / IS 6911SS tube profiles and material grades 304 / 316Handrails, SS railings, staircaseMaterial approval
IS 617 / ECBC 20176063-T5 aluminium + DGU thermal performanceADW, curtain wall, aluminium railingsGreen building / ECBC dossier
IS 800 / IS 2062Structural steel — industrial guard railsIndustrial safety railings, CRCAFactory safety compliance
HAG / NABH / AAISector-specific accessibility and authority marginsHealthcare, aviation, metroSector authority submittal

Manufacturing Capability Matrix

Capability In-house process Materials Typical output Product page
SS tube fabricationCutting, TIG welding, grinding, passivationSS 304, SS 316 (IS 6911)Handrails, balustrades, staircase packagesSS railings
Glass balustrade assemblyChannel / standoff fixing, panel QC, packingIS 2553 / IS 16613 glassFrameless balcony, atrium edge systemsGlass railings
Aluminium extrusion systemsCutting, assembly, anodising / powder coat coordination6063-T5 (IS 617)ADW, curtain wall, aluminium railingsADW
Partition & facade glazingFramed / frameless partition, mullion curtain wallDGU, acoustic laminated glassOffice fit-out, hospital clinical zonesPartitions
Industrial guard railCRCA fabrication, HDG coating coordinationIS 2062 / IS 800 structuralMezzanine, platform, machinery edgeIndustrial safety
Structural engineeringIS 875 calcs, shop drawing, sign-off lettersAll systemsPMC submittal packs per projectNBC reference

Quality Control Workflow — Fabrication to Dispatch

Stage QC checkpoint Record generated PMC / EPC use
1. Material receiptMTC verification — grade, chemistry, dimensionsIncoming inspection logMaterial traceability dossier
2. Shop drawing approvalDimension freeze, fixing detail, load classStamped DWG + PDFGFC / design freeze gate
3. FabricationWeld inspection, finish QC, glass panel checkBatch production recordFactory inspection (optional)
4. Pre-dispatchDimensional check, packing list, MTC bundleDispatch QC reportDelivery reconciliation
5. Site installation supportMethod statement compliance, torque / fixing auditInstallation reportPMC site QA
6. HandoverAs-built dossier, O&M manual, compliance packClose-out PDF setProject completion sign-off

PMC / EPC Documentation Capability Matrix

Documents available for all commercial orders — formatted for PMC technical submittal, EPC tender evaluation and authority approval.

# Document Format Turnaround PMC use EPC use
1IS 875 Part 3 wind load calculationPDF + calc sheet5–7 daysDesign basis approvalBOQ verification
2IS 875 Part 5 imposed load confirmationPDF3–5 daysSpec complianceTender submittal
3NBC 2016 compliance statementPDF2–3 daysAuthority submittalDeveloper dossier
4AutoCAD shop drawings — stampedDWG + PDF7–10 daysDesign freeze / GFCProduction release
5Material test certificates — glass / SS / aluminiumPDF per batchPer production batchMaterial approvalTraceability audit
6HAG / NABH / AAI / ECBC sector statementPDF3–5 daysSector authorityGreen building cert
7Third-party inspection coordination letterPDFOn requestQA protocolSite inspection scope
8O&M manual + handover compliance packPDF3–5 days post-dispatchClose-out dossierDefects liability

PMC pre-submittal checklist: □ ISO 9001 certificate on file  □ IS 875 calc by wind zone  □ NBC height by occupancy  □ MTC batch references on BOQ  □ Shop drawings stamped pre-GFC  □ Sector statement (HAG / AAI / ECBC) where applicable  □ Third-party inspection scope agreed

Compliance References — Standards by Product Line

Product line Primary standards Key values Reference page
Glass railings / balconyNBC 2016, IS 875, IS 2553, IS 166131050 mm, 0.75 kN/m + wind, 12 mm laminatedGlass railings · Balcony
Handrails / staircaseNBC 2016, IS 4270, IS 875 Part 5, HAG900 mm from nosing, 38–50 mm grip, 1.5 kN/mHandrails · Staircase
SS railings — assembly zonesNBC 2016, IS 875 Part 5, IS 69113.0 kN/m, SS 316 high-trafficSS railings
Aluminium ADW / curtain wallIS 617, ECBC 2017, IS 875 Part 36063-T5, DGU U-value / SHGC per ECBCADW · Curtain wall
Acoustic partitionsNBC 2016, STC laboratory testSTC 42–50 clinical zonesAcoustic partitions
Industrial safetyIS 800, IS 875, IS 2062HDG CRCA, mezzanine guard loadIndustrial safety

Product & Sector Capability Index

Navigation from manufacturer credentials to product specification pages, sector guides and project evidence.

Hub / sector Page Credential relevance
Railing productsGlass · Handrails · SS · Staircase · Balcony · Aluminium · IndustrialIS 875 / NBC spec matrices per product
Glazing & facadeADW · Curtain wall · Framed partitions · Acoustic partitionsECBC, STC, IS 617 documentation
Sector guidesHigh-rise · Aviation · Healthcare · IT parksSector-specific PMC checklists
Compliance hubNBC 2016 referenceHeight and load values by occupancy
Project evidenceProjects portfolio · Case studiesNamed references + quantified scope

Projects portfolio →  ·  Case studies →  ·  Request documentation pack →

Request Our Company Profile

A full company profile document including manufacturing facility details, quality system certificate, project references (on request), key personnel credentials and standard documentation pack is available for procurement teams, specification consultants and tender evaluation committees. Contact us to request a copy.

Discuss Your Project and Documentation Requirements

We respond to all B2B enquiries within 24 business hours with a fully specified quotation and documentation checklist.

Get a Quote Contact Us