Railings India

Sector Specification Guide — Railings India

Railing & Glazing Systems for IT Parks and Corporate Campuses

Glass partitions, frameless balustrade, aluminium doors and windows, and curtain wall systems for SEZ developments, IT parks and corporate campuses across Hyderabad, Bengaluru, Pune, Chennai and Delhi NCR.

Get a Sector-Specific Quote

Products Supplied to This Sector

Glass Partitions

Open-plan office partitioning in frameless, framed and acoustic systems. STC 32–50. NBC 2016 compliant. Demountable options available.

View product →

Frameless Glass Balustrade

Full-height frameless glass balustrade for atria, mezzanines and feature staircases in corporate lobbies.

View product →

Aluminium Windows

6063-T5 sliding and casement windows with DGU low-e glazing for ECBC compliance. SHGC and U-value documentation supplied.

View product →

Curtain Wall Systems

Thermally broken aluminium curtain wall for high-rise IT park towers. ECBC compliant. Green building documentation available.

View product →

Aluminium Shop Fronts

Full-height glazed shop front systems for ground-floor retail, cafeteria and banking outlets within IT parks.

View product →

Structural and Compliance Notes for This Sector

IT park towers in SEZ developments are typically G+8 to G+20 commercial buildings. IS 875 Part 3 wind loads at upper floors in Zones II–IV require structural calculation for all external railing and glazing systems. ECBC 2017 is mandatory for all conditioned areas above 500 sqm — our aluminium window and curtain wall systems are supplied with full ECBC compliance documentation and DGU low-e glazing options.

IT park and SEZ projects typically require comprehensive documentation for both local authority technical sanction and green building certification (IGBC, LEED or GRIHA). We supply IS 875 structural certificates, ECBC performance data for window and curtain wall systems, and NBC 2016 compliance statements for all glass partition and railing systems.

Railings India, part of Sun Corporation India, manufactures glass partitions, balustrade and aluminium facade systems from Hyderabad for SEZ developers, PMC consultants, EPC contractors and corporate campus planners. Reference supply includes SEZ IT Park (Bengaluru) and Microsoft Campus — with IS 875 structural calculations, ECBC performance data and NBC 2016 compliance statements supplied as standard on IT park orders.

IT Parks & Corporate — NBC 2016 / IS 875 / ECBC Specification Matrix

Reference specification matrix for SEZ PMC technical submittals, green building certification packages and EPC tender BOQs. Values align to NBC 2016 Part 4 commercial occupancy and IS 875 Part 5 unless noted. SEZ commercial buildings require 1050 mm height and 1.5 kN/m horizontal load as standard.

Location within campus NBC occupancy Min height (mm) Load (kN/m) System spec Facade / frame Standard / authority
Office tower atrium / mezzanineCommercial1050–11001.5–3.0Frameless glass balustradeSS 304 / 316NBC 2016 Part 4
Feature staircase / lobbyCommercial900 (from nosing)1.5SS handrail + glass infillSS 304NBC 2016 + IS 4756
Open-plan office partitionCommercialN/AN/ASTC 32–50 framed / frameless glassAluminiumNBC Ch. 4 + demountable spec
Tower curtain wall facadeCommercialN/AIS 875 Part 3 windThermally broken DGU low-e6063-T5 aluminiumECBC 2017 + IGBC / LEED
Ground-floor retail / cafeteriaCommercialN/AN/AFull-height glazed shop frontAluminiumSEZ authority + NBC
Terrace / amenity deck edgeCommercial10501.5Glass or SS balustradeSS 316 (exposed)IS 875 Part 3 wind zone
Parking ramp guardrailCommercial10501.5SS or MS guard railSS 304 / MS HDGNBC ramp guardrail

System Selection Matrix — IT Parks & Corporate

Factor Glass partitions Frameless balustrade Curtain wall Aluminium windows
Typical applicationOpen-plan offices, meeting roomsAtria, lobbies, feature stairsTower facade G+8 to G+20Office perimeter glazing
Green building relevanceDemountable creditsDaylight penetrationECBC envelope performanceSHGC / U-value compliance
MaintenancePanel replacementGlass panel swapSeal + gasket inspectionHardware service
Documentation intensityMediumHigh (IS 875)Highest (ECBC + wind)High (ECBC data)
Product pageGlass partitionsGlass railingsCurtain wallAluminium windows

PMC / SEZ Authority Documentation Checklist

Documents Railings India supplies for IT park PMC, SEZ authority and green building submittal packages. Request via sector-specific enquiry.

# Document Format PMC / authority use
1IS 875 Part 3 wind load calculation (zone-specific)PDF + calc sheetDesign basis approval
2IS 875 Part 5 imposed load confirmation (1.5 kN/m commercial)PDFBOQ / spec verification
3NBC 2016 height compliance statement by zonePDFSEZ / local authority submittal
4ECBC performance data — SHGC, U-value, VTPDFGreen building certification
5AutoCAD shop drawings (plan, elevation, fixing detail)DWG + PDFDesign freeze / GFC
6Glass / aluminium MTC per batchPDF per batchMaterial approval
7Installation method statementPDFSite safety plan
8STC / acoustic partition test report (if specified)PDFMeeting room privacy spec
9Third-party inspection coordination letterPDFPMC QA protocol
10O&M manual — cleaning, replacement, seal maintenancePDFHandover dossier

PMC pre-submittal checklist: □ NBC 1050 mm height on all open edges  □ IS 875 Part 3 wind zone confirmed  □ ECBC SHGC / U-value on window schedule  □ 1.5 kN/m load on balustrade drawings  □ Green building credits mapped  □ Shop drawings stamped pre-GFC  □ SEZ authority format confirmed

EPC Contractor Workflow — IT Park Glazing & Railing Package

Stage EPC action Railings India deliverable Duration Approval gate
1. EnquiryShare tower GA, facade schedule, green building targetBudgetary spec + compliance matrix2–3 daysPMC technical review
2. Technical submittalIssue LOI / draft POFull document pack (items 1–7 above)5–7 daysPMC + SEZ authority
3. Shop drawing approvalComment fixings, mullion centres, partition runsRevised stamped drawings7–10 daysPMC design freeze
4. GFC releaseConfirm quantities per tower / floorFinal BOQ + production release2 daysEPC procurement
5. FabricationHyderabad factory QA + batch MTCs4–8 weeksEPC factory inspection (optional)
6. Mock-up (if required)Install sample facade / partition panelPanel + test report1–2 weeksArchitect + PMC sign-off
7. Dispatch & installationTower-wise delivery programmePacked systems + install guidePer programmeSite logistics plan
8. HandoverSubmit as-built + dossierO&M manual + ECBC compliance pack3–5 daysPMC / green building close-out

IT Park & Corporate Project Evidence

Project references drawn from Railings India portfolio already published on case studies and projects. No additional project names introduced.

Project / zone Sector Scope Key specification Documentation
SEZ IT Park (Bengaluru)Corporate / SEZGlass partitions + curtain wall — 3 towers12,000 sqft, ECBC DGUECBC + NBC + shop drawings
Microsoft CampusCorporate campusCorporate glazing packagesHyderabad — partitions + facadeFull PMC submittal pack
Office atrium / lobby zonesCorporate — publicFrameless balustrade + feature stairs1050–1100 mm, 1.5 kN/mIS 875 + NBC compliance
Ground-floor retail / amenityCorporate — commercialAluminium shop fronts + glazed entriesFull-height glazed systemsSEZ authority format

Outcome — SEZ IT Park (Bengaluru): 12,000 sqft framed glass office partitions and aluminium curtain wall across 3 towers — ECBC DGU documentation supplied for green building certification.

Outcome — Microsoft Campus: Corporate glazing packages for Hyderabad campus — partitions and facade systems with full PMC submittal documentation.

IT park case study →  ·  Manufacturer credentials →  ·  Get a sector-specific quote →

Discuss Your Project Requirements

Share your project drawings and sector specification requirements. We respond with a fully documented quotation within 24 hours.

Get a Quote