Aluminium framed glass partition systems for offices, hospitals, shopping malls, IT parks and institutional buildings. The most cost-effective glass partition specification for large projects. NBC 2016 compliant. Pan India supply.
Get a QuoteFramed glass partition systems from Railings India use 8mm or 10mm IS 2553 toughened glass in 6063-T5 aluminium frame sections. The most widely specified glass partition type for large commercial, healthcare and institutional projects across India — combining visual openness with structural reliability and NBC 2016 compliance at the lowest cost per square foot of the glass partition range.
Framed glass partitions are the standard specification for commercial office fit-outs in IT parks, SEZ developments and business districts. Demountable systems allow reconfiguration as tenant requirements change — a key requirement for landlord-and-tenant specifications in large commercial developments.
Framed glass partitions for hospital ward separators, pharmacy counters, nursing stations and administrative offices. No horizontal ledges that collect dust — infection-control compliant for NABH-accredited hospital environments. Systems meet NBC 2016 Chapter 4 requirements for glazing in healthcare occupancies.
Framed glass partition systems for mall management offices, retail banking fit-outs, food court separators and anchor store back-of-house zones. Standard mall specification — cost-effective, visually transparent and compliant with mall authority submission requirements.
| Feature | Framed | Frameless | Acoustic |
|---|---|---|---|
| Glass thickness | 8–10mm toughened | 10–12mm toughened | Laminated / DGU |
| STC rating | 33–38 | 28–33 | 38–50 |
| Frame visibility | Aluminium frame visible | Minimal channel only | Full frame + seals |
| Cost per sqft | Economy | Higher | Higher investment |
| Demountable | Yes | Partial | Fixed or demountable |
| Best project type | Offices, hospitals, malls | Airports, HQ lobbies | Boardrooms, hospitals |
| NBC 2016 | Yes | Yes | Yes |
Railings India, part of Sun Corporation India, manufactures framed glass partition systems from Hyderabad for IT park developers, hospital facility managers, PMC consultants and EPC fit-out contractors. Reference supply includes SEZ IT Park (Bengaluru) office partition packages, Microsoft Campus corporate glazing and 800-Bed Hospital (Hyderabad) consulting room partitions — with ECBC glazing performance data, IS 2553 glass MTCs and shop drawing documentation supplied as standard on framed partition orders.
Reference specification matrix for PMC technical submittals and EPC fit-out BOQs. Glazing performance values align to ECBC 2017 — U-value ≤ 3.3 W/m²K, SHGC ≤ 0.25 where energy compliance applies. Structural references IS 875 Part 3 for wind load on exterior glazed screens.
| Application | Occupancy | Glass spec | Frame | ECBC target | Standard |
|---|---|---|---|---|---|
| IT park open-plan office partition | Commercial | 10 mm toughened (IS 2553) | 6063-T5 aluminium | U ≤ 3.3, SHGC ≤ 0.25 | ECBC 2017 + NBC Ch. 4 |
| SEZ meeting room — single glazed | Commercial | 10–12 mm toughened | 6063-T5 powder coat RAL | Visual privacy — STC 32–38 | IS 2553 |
| Hospital consulting room partition | Institutional | 10 mm toughened + film | 6063-T5 aluminium | Privacy film — NABH compatible | NBC institutional |
| Corporate campus executive suite | Commercial | 10 mm toughened + manifestation | 6063-T5 anodised | U ≤ 3.3 | ECBC + NBC safety glass |
| IIT Hyderabad lab / office screen | Institutional | 10 mm toughened | 6063-T5 aluminium | Standard commercial | IS 2553 + NBC |
| Reception / lobby feature screen | Commercial | 12 mm laminated (IS 16613) | 6063-T5 + SS patch | Safety glass mandatory | NBC safety glazing |
| Exterior glazed screen — podium | Commercial | DGU 24 mm (ECBC) | 6063-T5 curtain wall profile | U ≤ 3.3, SHGC ≤ 0.25 | ECBC 2017 + IS 875 Part 3 |
| Environment | Frame finish | Glazing option | Rationale |
|---|---|---|---|
| IT park open office — standard | Powder coat RAL 9010 / 9006 | 10 mm clear toughened | Cost-effective; daylight transmission |
| Hospital consulting / ward screen | Powder coat — wipe-down surface | 10 mm + frosted film | Patient privacy; infection-control compatible |
| Premium corporate / boardroom | Anodised natural / bronze | 10 mm low-iron toughened | Superior clarity; architect-specified finish |
| ECBC-compliant exterior screen | PVDF (Kynar) | DGU 24 mm — U ≤ 3.3 | Green building certification requirement |
Decision reference for PMC teams selecting interior and exterior glazed systems. See NBC 2016 compliance guide for safety glazing requirements.
| Factor | Framed glass partition | Acoustic partition | Curtain wall mullion | Frameless glass |
|---|---|---|---|---|
| Typical application | Office, meeting rooms | Hospital, call centre | Building facade | Premium office feature |
| STC / acoustic | 32–38 (single glazed) | 42–50 (DGU acoustic) | N/A — exterior | 28–35 |
| ECBC performance | Interior — limited | Interior — limited | U ≤ 3.3, SHGC ≤ 0.25 | Interior — limited |
| Sector guide | IT parks | Healthcare | IT parks | IT parks |
| Product page | Framed partitions | Acoustic partitions | Curtain wall | Glass partitions |
Documents supplied for framed partition PMC submittal packages. Request via project enquiry.
| # | Document | Format | PMC use |
|---|---|---|---|
| 1 | ECBC glazing performance data sheet (U-value, SHGC) | Green building submittal | |
| 2 | IS 875 Part 3 wind load (exterior screens only) | PDF + calc sheet | Design basis approval |
| 3 | NBC safety glazing compliance statement | Authority submittal | |
| 4 | AutoCAD shop drawings — plan, elevation, door detail | DWG + PDF | Design freeze / GFC |
| 5 | Aluminium MTC — IS 617 grade 6063-T5 | PDF per batch | Material approval |
| 6 | Glass MTC — IS 2553 / IS 16613 | PDF per batch | Material approval |
| 7 | Finish specification sheet (RAL / anodise / PVDF) | Architect colour approval | |
| 8 | Installation method statement — floor track fixing | Site safety plan | |
| 9 | Third-party inspection coordination letter | PMC QA protocol | |
| 10 | O&M manual — panel replacement, track maintenance | Handover dossier |
PMC pre-submittal checklist: □ ECBC U ≤ 3.3 / SHGC ≤ 0.25 where applicable □ IS 2553 toughened glass on all panels □ Finish spec (RAL / anodise) confirmed □ Door hardware schedule attached □ Floor track fixing detail on drawings □ Shop drawings stamped pre-GFC □ Privacy film spec (hospital) confirmed
| Stage | EPC action | Railings India deliverable | Duration | Approval gate |
|---|---|---|---|---|
| 1. Enquiry | Share floor plan, partition schedule, finish spec | Budgetary spec + compliance matrix | 2–3 days | PMC technical review |
| 2. Technical submittal | Issue LOI / draft PO | Full document pack (items 1–8) | 5–7 days | PMC + developer |
| 3. Shop drawing approval | Comment door positions, track layout | Revised stamped drawings | 7–10 days | PMC design freeze |
| 4. GFC release | Confirm quantities per floor / zone | Final BOQ + production release | 2 days | EPC procurement |
| 5. Fabrication | — | Hyderabad factory QA + batch MTCs | 3–5 weeks | EPC factory inspection (optional) |
| 6. Mock-up (if required) | Install sample partition module on site | Panel + finish approval report | 1–2 weeks | Architect + PMC sign-off |
| 7. Dispatch & installation | Floor-wise delivery aligned to fit-out programme | Packed modules + install guide | Per programme | Site logistics plan |
| 8. Handover | Submit as-built + dossier | O&M manual + compliance pack | 3–5 days | PMC close-out |
Project references drawn from Railings India portfolio on case studies and projects. No additional project names introduced.
| Project / zone | Sector | Scope | Key specification | Documentation |
|---|---|---|---|---|
| SEZ IT Park (Bengaluru) | Corporate / SEZ | Framed glass office partitions — 3 towers | 6063-T5, ECBC DGU, 12,000 sqft | ECBC + shop drawings |
| Microsoft Campus | Corporate campus | Framed glass partition packages — Hyderabad | 10 mm toughened, RAL finish | Full PMC submittal pack |
| 800-Bed Hospital (Hyderabad) | Healthcare | Consulting room framed partitions — 60 rooms | 10 mm + privacy film, 8 floors | NABH + NBC compliance |
| IIT Hyderabad | Institutional | Office and lab framed glass screens | 10 mm toughened, 6063-T5 frame | IS 2553 + shop drawings |
Outcome — SEZ IT Park (Bengaluru): Framed glass office partitions across 3 towers — 12,000 sqft with ECBC DGU glazing documentation for green building certification.
IT park case study → · IT park sector guide → · Healthcare sector guide → · Manufacturer credentials →
All framed glass partitions use IS 2553 toughened safety glass, 8mm or 10mm thickness depending on panel size. IS test certificates are supplied with every project. Laminated glass for improved acoustic performance is available as an upgrade within the framed system.
Yes. Our framed aluminium glass partition systems are fully demountable and reconfigurable. This is the key reason framed systems are specified for IT park and SEZ office fit-outs where tenant churn requires periodic space reconfiguration. We supply AutoCAD drawings for reconfiguration planning.
Standard single-glazed framed partitions achieve STC 33–38. For improved acoustic performance, double-glazed framed systems achieve STC 38–44. For spaces requiring STC 45+, we recommend our acoustic glass partition system with laminated glass and perimeter acoustic seals.
Our minimum supply quantity is 300 sq ft. For large project packages (5000+ sq ft), we provide dedicated project management, fixed-price supply agreements and priority manufacturing allocation. Contact our technical team with your floor plan for detailed pricing.
Yes. Our framed glass partition systems integrate swing doors (single or double, with floor spring or overhead closer) and sliding glass doors within the same aluminium frame system. All door hardware is supplied as part of the partition package.
IS-certified toughened glass in NBC 2016 compliant aluminium frame systems. Full documentation for institutional procurement and authority approval.
Systems designed for full demount and reconfiguration. The standard specification for IT parks and SEZ developments with changing tenant requirements.
Lowest cost per square foot in the glass partition range — maximum value for large-scale commercial, hospital and institutional projects.
500+ glass partition projects delivered across India. Factory-direct pricing with Pan India logistics and project management for large packages.
Submit your floor plan area, system requirements and location. Our technical team responds within 24 hours with pricing and shop drawing turnaround.
Request a QuoteFramed glass partition aluminium sections are extruded in 6063-T5 alloy — the same architectural alloy used in our window and door systems. Standard frame widths are 38mm, 50mm and 75mm visible face, with the wider profiles providing greater rigidity for taller partitions and better acoustic performance through increased mass. Frame finish options: anodised silver, anodised champagne, powder coat in any RAL colour, and wood-effect powder coat for applications where a warmer aesthetic is required.
The frame perimeter — top track, bottom channel, and vertical mullions — carries the glass load. This is what makes framed systems more tolerant of variations in partition height and slab deflection than frameless systems: the frame can be shimmed and adjusted at installation to accommodate site conditions without affecting the glass specification.
Framed aluminium glass partitions are the most cost-effective glass partition specification for large commercial fit-outs — typically 40–60% cheaper per square foot than frameless systems and 70–80% cheaper than acoustic DGU systems. For SEZ developments, IT parks and corporate campuses with 5,000–20,000 sqft of open-plan floor to partition, this cost difference is significant at project scale.
The trade-off is visual: the aluminium frame is visible at panel edges, which some clients find less premium than frameless. In practice, for most corporate office environments, the framed system looks clean and professional and the cost saving is better applied to other building elements. Frameless makes sense where sightlines and maximum transparency are an architectural priority — lobbies, boardrooms, executive areas.